Lovable Cloud to Supabase
Migration Checklist
The complete checklist for migrating from Lovable Cloud to Supabase — in the right order, without skipping critical steps that cause data loss or auth breakage.
Lovable Cloud to Supabase Migration Checklist — Quick Summary
- Document every table, column, data type, and row count in your Lovable Cloud projectCritical
- Map all foreign key relationships and identify dependency order for exportCritical
- List every authentication provider in use (email/password, Google, GitHub, magic link)Critical
- Inventory all storage buckets and estimate total file size
- Record all active Lovable Cloud API keys and OAuth callback URLs
- Export Lovable Cloud data via API mirroring with pagination for large tablesCritical
- Verify row counts match between Lovable export and local backupCritical
- Create Supabase project and configure the correct region (closest to your users)Critical
- Design and create PostgreSQL schema with proper types, indexes, and constraintsCritical
- Import data in dependency order — parent tables before child tablesCritical
- Run full integrity check: row counts, foreign key tests, 50+ spot-check recordsCritical
- Migrate user accounts to Supabase Auth — preserve bcrypt hashes (no password resets)Critical
- Update OAuth provider callback URLs to point to new Supabase projectCritical
- Download all files from Lovable Cloud storage and upload to Supabase Storage buckets
- Run URL re-mapping script to update all storage references in the databaseCritical
- Configure Row Level Security (RLS) policies on all tablesCritical
- Migrate or rewrite server-side logic as Supabase Edge Functions
- Replace Lovable SDK with Supabase SDK and update all queries and mutationsCritical
- Generate TypeScript types from new Supabase schema for full type safety
- Deploy to staging, run full end-to-end test of all user flows and auth pathsCritical
- Execute blue-green traffic switch to Supabase — keep Lovable Cloud running 30 daysCritical
- Monitor error rates and query latency for 7 days post go-live
Pre-Migration Audit
Document every table, column, data type, and row count in your Lovable Cloud project
Map all foreign key relationships and identify dependency order for export
List every authentication provider in use (email/password, Google, GitHub, magic link)
Inventory all storage buckets and estimate total file size
Record all active Lovable Cloud API keys and OAuth callback URLs
Database Migration
Export Lovable Cloud data via API mirroring with pagination for large tables
Verify row counts match between Lovable export and local backup
Create Supabase project and configure the correct region (closest to your users)
Design and create PostgreSQL schema with proper types, indexes, and constraints
Import data in dependency order — parent tables before child tables
Run full integrity check: row counts, foreign key tests, 50+ spot-check records
Auth, Storage & Functions
Migrate user accounts to Supabase Auth — preserve bcrypt hashes (no password resets)
Update OAuth provider callback URLs to point to new Supabase project
Download all files from Lovable Cloud storage and upload to Supabase Storage buckets
Run URL re-mapping script to update all storage references in the database
Configure Row Level Security (RLS) policies on all tables
Migrate or rewrite server-side logic as Supabase Edge Functions
Frontend Swap & Go-Live
Replace Lovable SDK with Supabase SDK and update all queries and mutations
Generate TypeScript types from new Supabase schema for full type safety
Deploy to staging, run full end-to-end test of all user flows and auth paths
Execute blue-green traffic switch to Supabase — keep Lovable Cloud running 30 days
Monitor error rates and query latency for 7 days post go-live
Don't Want to Work Through the Checklist Yourself?
Our Lovable Cloud to Supabase migration tool handles every item on this checklist — including the critical steps that most DIY migrations get wrong. From $300, 3–7 days.
Checklist FAQs
What is the correct order to migrate from Lovable Cloud to Supabase?
Always start with the audit phase to map your data structure. Then migrate the database first, followed by auth users, then storage assets. Only do the frontend SDK swap last — after everything is verified in Supabase.
What steps are most commonly skipped — and what breaks?
The three most-skipped steps are: (1) row-count validation after database import — causes silent data loss, (2) storage URL re-mapping — causes all images and files to break, (3) RLS policies — leaves your data publicly exposed.
How long does it take to complete the full checklist?
DIY: 2–4 weeks of part-time engineering. With our migration tool and service: 3–7 business days with expert oversight.
Do I need to shut down my Lovable app during migration?
No. The correct approach is to run Lovable Cloud and Supabase in parallel, validate everything on Supabase, then do a traffic switch. Keep Lovable Cloud running for 30 days as a fallback.